Technical Proposal Utilization Plan for the Main Construction of the 〇〇 Dam - Rainfall Countermeasures
Utilization plan for technical proposals: Rainfall measures in dam construction.
■On-site Issues: Focus Points in Evaluation (Example) Proposals for construction methods that consider the surrounding environment ■Proposal (Example) Utilizing the 【Natural Disaster Prevention System ZEROSAI】 to manage pinpoint weather forecasts for 17 days ahead at a 500m mesh on-site, along with continuous cloud-based management of weather observation data and information on warnings and advisories issued by the Meteorological Agency. Installing 【N Sensors】 on-site to utilize observation data to improve the accuracy of heat index (WBGT) and wind speed predictions. Additionally, using 【Disaster Prevention Lights】 and 【Three-color Display Lights】 to continuously display weather information and provide phased alerts to workers. *For more details, please visit our website or feel free to contact us.
- Company:シスメット 本社/福岡県北九州市 ・東日本オフィス/埼玉県入間市 ・北日本オフィス/北海道札幌市
- Price:Other